Camber calculation dialog

Used to define if and when the camber shall be calculated, as well as the prefixes for the camber calculations.

By entering a label the action DoCamber can be added to the schedule of the Analyzer, in fact optionally at the begin and the end of the stage, after the calculation of the load case "Pre-stressing", after the load case "Traveler" and after the load case "Wet concrete". For more detailed information for the command DoCamber see online-help of RM Bridge.
SettingDescription
Camber at begin If checked, the camber for the begin of the stage will be stored
Camber at the end If checked, the camber for the end of the stage will be stored.
Prestressing Label for the command DoCamber after prestressing (e.g., PT).
Traveler Label for the command DoCamber after traveler calculation (e.g. TR).